PAPER TITLE :VALUATION OF ALLUVIAL ORE RESERVE IN AN ABANDONED CONSOLIDATED TIN MINE, BUKURU- JOS PLATEAU STATE

FUTA JOURNAL OF ENGINEERING AND ENGINEERING TECHNOLOGY | VOLUME 9 NUMBER 1 2015

Paper Details

  • Author(s) : Afeni T. B.1, Lawal A. I. 1 and Omosayin S. J. 2
  • Abstract:

A B S T R A C T
This research work evaluates the ore reserve estimate of the abandoned alluvial tin deposit. The objectives of the
research were achieved through visitation, oral interview and internet sourcing. The prospecting plan of the mining
lease of the studied Mine (ML.16957, B/Ladi) was also collected and used in the analysis. An abandoned area of the
mine was extracted from the prospecting plan of the mining lease; while assay value, drill hole depths were gotten
from the prospecting plan. Reserve estimation methods used are the triangle and the polygonal methods. The reserve
data analysis revealed that about 121.08 metric tons of cassiterite reserve remained un-mined in the ore block. The
average depth of the un-mined area of the block is about 56.99ft (17.37m) as against 15.28ft (4.66m) for the whole